The estimated operating time per year starts from 800 to 2000 hours.
The larger the versatility numbers, the longer equipment duration and the lower the numbers, the smaller the opportunities to change job functions.
The working hours are charged as the hours an equipment is assigned to a job.
Having said this, if a machine owner uses it on one shift for 5 days i a year, the estimated operating time determines the ownership cost.
13. Equipment Operating Costs
One of the biggest factors that must be included in the construction equipment guide are the operating costs.
In particular, these costs increase together with the number of operating hours while varying with the operating conditions.
Remember that sticking to the costs limit in business is the same as obeying construction permits by law.